Abstract
This research presents the design and implementation of the preventive and predictive maintenance plan developed for the seven polishing machines of the Swedish multinational SKF, of the LSB (Large Size Bearing) line. Based on Reliability Centered Maintenance (RCM), which allows identifying the most relevant equipment for the process through a criticality analysis adopting strategies in order to eliminate the occurrence of failures. The methodology implemented in this research allowed the generation of maintenance tasks that facilitated the management and visualization of the information of each asset. The company provides maintenance services for large bearings used in cement plants, foundries and industrial material transport machines, seeking to optimize production methods and the application of this theoretical and analytical procedure allowed verifying that the conditioning services offered by the company are more efficient, demonstrating with figures the retribution of the plan.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.