Abstract

The paper studies the methods of prevention of necking of casings and in particular, production strings, as well as the complications occurring in the drilling process in the Caspian Sea as a result of clay flowing out and prediction of such kind of issues. Moreover, in the selection of production strings, “Stress Check” software program was used. One of the geological issues leading to the necking of casing is probably poorly cemented clay layers. In addition, the structure of the well drilled in Bulla-deniz field, formation pressure and the selection of casing for this well have been considered. In conclusion, the selection of casing to be lowered into the gas well in Bulla-deniz field has been executed via “Stress Check“ software program.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.