Abstract

Produced water isolated from the oil in oil-gas production is pumped into the injection wells after cleaning from salt deposits and mechanical impurities. In the mixture of high-mineralised produced water, salt deposits making the technological equipment and pipes useless while gathering and transportation, reduce the permeability of injection wells. Carried out experimental researches show that for each ton it is necessary to pump 100 g of KD-7 inhibitor to prevent salt deposition in the mixture of produced water. Technological processes should be performed in a closed system, and the territories contaminated with oil and produced water cleaned and equipped well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.