Abstract

Causes of deformations of a five-story tenement building constructed on a slope are analyzed. Engineering measures that have made it possible to terminate development of settlements of risk to the building, and prevent continued sliding of the slope are described. Results are presented for geodetic observations on the building's settlements in different years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.