Abstract

Pertamina EP Pertamina EP Donggi Matindok Field realizes that sustainable development activities need to pay attention to environmental aspects, including efforts to reduce the load of water pollution. In the production process at Matindok Central Processing Plant (CPP), byproducts are produced in 2 forms: solid sulphur and wastewater from the Biological Sulphur Recovery Unit (BSRU). Sulphur solids carried in wastewater can cause blockages known as plugging in injection wells and disrupt the production process. This study aims to reduce the water pollutants by integrating a nanofiltration membrane in the Bleed Water Treatment (BWT) to reduce the Total Dissolved Solid (TDS) content in wastewater after being processed in the After Treatment Unit (ATU). The experimental results showed a significant decrease in TDS values after nanofiltration membrane integration, from ≥14,000 mg/L to <4,000 mg/L. This program succeeded in reducing water pollution in 2023 by 272.68 tons of TDS.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.