Abstract
The mechanically unstable situation of a heavy Bingham fluid resting on top of a light Bingham fluid in an inclined closed-ended pipe can be stabilised if the fluids have sufficiently large yield stresses. This paper focuses on determining the yield stresses that are sufficient to keep the fluids statically stable for a given fluid density difference, pipe diameter and pipe inclination. The results are applicable to a broad class of practically observable flows. This situation provides an idealised model for the oilfield process of plug cementing.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.