Abstract

Abstract This paper presents the possibility of energy storage in natural gas transmission networks using two strategies. Proof-of-concept calculations were performed under a steady-state assumption, and the more promising option was additionally modeled in a transient approach. The first strategy is based on a dedicated compressor–expander system installed at two ends of a pipeline. An electric-driven compressor increases the gas pressure in periods of peak electricity generation, while a gas expander allows energy recovery at a later stage. The compressor–expander distance determined by the inlet flow velocity of 5 m/s and a 4–5 h time shift ranges from approx. 75 to 120 km. The system provides a synergy effect, which allows to exceed 100% storage efficiency by reducing transmission losses. Storage efficiency obtained from the simplified model ranges from 70% to 128% for the performed case study. The second option uses existing compressors and pressure letdown stations expanding the gas to the distribution pressure. Here, gas pre-heating required prior to the expansion reduces the storage efficiency to about 30–40%. The dedicated machinery option was also evaluated using a transient model, which reports a lower efficiency if applied to the same assumptions. The system redesigned with the transient model is characterized by a longer storage duration (about 12 h) and a promising efficiency of 103.5%. Further research is needed to find the optimum design system parameters and to solve the detected problem of simultaneous compressor–expander operation which introduces idle work to the designed system.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call