Abstract

A linear programming interior point algorithm is proposed for the solution of the problem of coordinating directional overcurrent relays in interconnected power systems considering definite time backup relaying. The proposed algorithm is a variation of the primal–dual approach that uses multiple correctors of centrality. Pre-solution problem filtering simplification techniques are used prior to the application of the linear programming algorithm. Results are presented for the application of the methodology on a realistic test case, a 115–69 kV power system with 108 buses, 86 lines, 61 transformers, and 97 directional overcurrent relays. Optimal solutions are found in an automatic fashion, using the algorithm for the settings of the ground relays as well as for the phase relays. The application of the pre-solution problem simplification techniques is highly recommended, resulting in a significant reduction of the size and complexity of the linear programming problem to be solved. The interior point approach reaches a feasible point in the close vicinity of the final optimal result in only one or two iterations. This fact represents an advantage for on-line applications. The proposed methodology and in particular the use of the presolve problem simplification techniques is shown as a new valuable tool for the setting of directional overcurrent relays in interconnected power systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.