Abstract

The performance of the RNB facility at KEK-Tanashi, which is a pilot facility for the E-arena in the KEK–JAERI joint project, is presented. The muonic X-ray spectroscopy of unstable nuclei by combining the RNB with muon-beam from the M-arena in the joint project is introduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call