Abstract

Abstract This paper presents a case history of ARCO Oil and Gas Company's (AOGC1) Naturally Occurring Radioactive Material (NORM) injection project that was conducted offshore in the Gulf of Mexico. The unique aspect of this project is that it was performed entirely offshore, using drill cuttings injection equipment. This project involved grinding and injecting approximately 1300 bbls of various NORM. Discussed in the paper is the historical regulatory considerations, reservoir selection and permitting process, pre-frac design process, the washing, grinding and injection process, and on-site data frac analysis and fracture post-mortem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.