Abstract

AbstractAlsace, in particular Haut-Rhin, is one of the main clusters of COVID-19 in France. There has been a shortage of essential supplies in the area, especially alcohol-based hand sanitizer. In this context, and in accordance with the decree dated March 6, 2020, our hospital management team asked us to start local production of alcohol-based handrub. This was a real challenge: In one week, we had to implement the production of handrub to meet the needs of a 1,400-bed hospital. The production had to comply with the French preparation guidelines and take place on specific premises, with qualified and calibrated equipment, by qualified staff, under the supervision of a pharmacist. The other big challenge we faced was the supply of pharmaceutical raw and packaging materials. During this particular critical period, all suppliers were out of stock. Here, we describe the organizational set-up and the decisions made, e. g., to use technical-grade ethanol before the publication of the decrees dated March 13 and March 23, 2020.

Highlights

  • Alsace, in particular Haut-Rhin, is one of the main clusters of the COVID-19 pandemic in France [1]

  • In accordance with the decree dated March 6, 2020, our hospital management team asked us to start local production of alcohol-based handrub. This was a real challenge: In one week, we had to implement the production of handrub to meet the needs of a 1,400-bed hospital

  • The production had to comply with the French preparation guidelines and take place on specific premises, with qualified and calibrated equipment, by qualified staff, under the supervision of a pharmacist

Read more

Summary

Introduction

In particular Haut-Rhin, is one of the main clusters of the COVID-19 pandemic in France [1]. There is a substantial shortage of essential and basic personal protective equipment and supplies, in particular of alcohol-based hand sanitizer. Our hospital pharmacy implemented the temporary local production of alcohol-based handrub to avoid running out of stock and to

Chronology of a tense week
Dry extract
Not carried out
Sterilization Staff
Preparation room
Back label
Routing circuit between pharmacy to central store worker
Conclusion