Abstract

A range of preparatory tasks for decommissioning the U-5 facility at VNIINM was performed in 2010–2016. Comprehensive engineering and radiation inspections were conducted, and cartograms of contamination were constructed. Deposits in the special utility systems were investigated. A detailed investigation of the contamination of the building structures was performed. Radioactively contaminated process media, sources of ionizing radiation, and radioactive wastes from technological equipment and rooms were removed. Design documentation for decommissioning the U-5 facility was developed and a positive final report by a government environmental commission of experts, final sanitary-epidemiological reports, and licensing for decommissioning were obtained. The measures made it possible to increase the radiation safety of the facility and prepare it for decommissioning.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.