Abstract
Despite recent advances in aircraft maintenance technology, the breakdowns and catastrophic accidents due to human failure during maintenance activities will continue to occur. This paper argues that the impact of human error is amplified by the increased frequency of activities as a result of premature maintenance (PRM). PRM refers to predated or early maintenance tasks resulting in additional activities over a long horizon. A novel methodology is proposed to monetize the impact of PRM and show its contribution to total maintenance cost. The proposed methodology is inspired by the proportional hazard model to capture the effects of human failure on the system's hazard rate. Our findings show that the contribution of PRM to the total operating cost is noticeable; this justifies a level of flight delay or even cancellation due to accommodate on-time maintenance activities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IEEE Transactions on Systems, Man, and Cybernetics: Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.