Abstract

A large-scale trial embankment provided with partially penetrating prefabricated vertical drains (PVD) was installed in consolidating marine clay deposits at East-Port said industrial zone project in Egypt. The trial embankment was constructed with a bottom area of 150x150m and a height of 5.5m to evaluate the efficiency of the improvement system and verify the design parameters. An intensive instrumentation system was built-up including shallow settlement indicators, vibrating wire piezometers, extensometer, and inclinometers. Two and three-dimensional finite element analyses (FE) were performed to study the effect of the preloading system provided with partially PVD in consolidating marine clay deposits. FE models were validated and showed good agreement with the field observations in terms of vertical displacement of embankment center, and lateral soil deformation beneath the embankment toe.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.