Abstract

The Large Coil Task (LCT) is a collaboration between the US, Euratom, Japan, and Switzerland for the production and testing of 2.5 × 3.5 m bore, superconducting 8-T magnets. The definitive tests in the design configuration, the six coils arrayed in a compact torus, will begin in 1985. Partial-array tests are being done in 1984. In January the initial cooldown of two coils was aborted because of helium-to-vacuum leaks that developed in certain seal welds when the coil temperatures were 170 to 180 K. In July three adjacent coils (designated JA, GD, CH) were cooled, and in August two were energized to the limits of the test facility. An overview of the results is presented, including facility, cooldown, energization, dump, recovery from intentional normal zones, strain, and displacement, for operation up to 100% of design current but below full field and stress. These initial results are highly encouraging.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.