Abstract

Shutdown seismic PSA was performed for the plant cold shutdown condition. Normally, automatic ECCS signal is blocked after the Permission Signal is indicated during the plant cooldown process of PWR. In response to this, PSA model including manual actuation of ECCS signal on the postulated LOCA condition during cold shutdown state was developed based on the actual plant Emergency Operation Manual, which consists of several steps, such as, 1) LOCA event diagnosis, 2) isolating RHR system, 3) manual actuation of ECCS signal, 4) switching RHR to Low Pressure Injection mode. This PSA model with evaluated human error rates, was quantified demonstrating that risk level for the cold shutdown condition is in the acceptable range, however, suggesting some room for model improvement considering more realistic manual ECCS actuation procedure depending on the size of the LOCA.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.