Abstract

Due to the fourth revolution experiencing, referred to as Industry 4.0, many production firms are devoted to integrating new technological tools to their manufacturing process. One of them, is rescheduling the tasks on the machines responding to disruptions. While, for static scheduling, the efficiency criteria measure the performance of scheduling systems, in dynamic environments, the stability criteria are also used to assess the impact of jobs deviation. In this paper, a new performance measure is investigated for a flowshop rescheduling problem. This one considers simultaneously the total weighted waiting time as the efficiency criterion, and the total weighted completion time deviation as the stability criterion. This fusion could be a very helpful and significant measure for real life industrial systems. Two disruption types are considered: jobs arrival and jobs cancellation. Thus, a Mixed Integer Linear Programming (MILP) model is developed, as well as an iterative predictive-reactive strategy for dealing with the online part. At last, two heuristic methods are proposed and discussed, in terms of solution quality and computing time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.