Abstract

With intermittently operated municipal waste water plants the aeration switching sequence should be optimized under the constraints that the solved nitrogen concentration in effluent has to be kept within its environmental limits. This is a highly nonlinear control problem because of the nonlinear biological process model ASM1 (Activated Sludge Model 1), the on-off state of the manipulated sequence and the concentration constraints. The constrained optimization was transformed to the unconstrained optimization of the predictive on-off control, as the violations of the constraints were converted to their economical costs. Furthermore, the cost of the aeration was considered in the cost function.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.