Abstract

Changes are the main causes of delays and cost overruns in construction projects. Various change management systems have been developed to minimize the impacts of changes and to facilitate good project management. This paper presents a change prediction system using activity-based dependency structure matrix (DSM) to facilitate change management. DSM is used to model the process that may occur as a result of changes. Consequently changes can be predicted by setting the change criteria for each activity in the form of rework scope. Furthermore, Monte Carlo simulation is introduced to analyze the change probability of activities involved in construction projects. The effectiveness of the prediction system is verified by applying this system to an office building project. This study provides a useful tool for project management teams to manage changes proactively and efficiently.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.