Abstract

This paper examines the problem of subway induced vibrations on line 4 of Beijing metro, which is currently under construction and is planned to pass in close proximity of the Physics Laboratory of Beijing University. The laboratory has a lot of equipment that is very sensitive to traffic induced vibrations and future operation of metro line 4 is a matter of concern. Hence, it is important to study the influence of subway induced vibrations inside the laboratory and to propose a viable solution to mitigate the vibrations. In this paper, the tunnel north of Chengfulu station is modelled using a coupled periodic FE–BE model and the free-field response due to moving trains is predicted. In addition, vibration measurements have been performed on the site of the Physics Laboratory to estimate the existing vibration levels due to road traffic. The predicted and measured vibrations are superimposed to assess the vibrations due to the combined effect of road and railway traffic in the vicinity of the Physics Laboratory. Apart from the numerical investigations, vibration measurements have also been performed on a similar site at line 1 of Beijing metro to substantiate the estimated results on metro line 4. Finally, it is studied how the vibrations can be controlled using a floating slab track, which is widely used as an effective measure of vibration isolation in tunnels. The efficiency of a 7.9 Hz floating slab track as a vibration countermeasure is assessed in this paper. This study demonstrates the applicability of the numerical model for the relevant assessment of subway induced vibrations and its use to study the performance of different track structures in the tunnel.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call