Abstract
With the rapid development of national infrastructure construction, the water inrush disaster of “strong burst, high water pressure and large flow” is more and more frequent in the construction process. To achieve high-precision prediction of tunnel water inflow, based on the Yue Longmen Tunnel, according to the structural plane detection data in the study area, combined with the Monte Carlo algorithm and using “parent-daughter” and “step–structure” correction mode, this paper constructs a random deterministic three-dimensional fracture network seepage model. Based on the three-dimensional fracture network seepage model and the principle of flow balance, the water inflow of each mileage section of the Yue Longmen Tunnel is solved by numerical calculation method, and good results are obtained through comparison and verification. The research results have important theoretical significance and engineering application value for tunnel water inflow prediction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.