Abstract
AbstractAngereb Dam, located in Ethiopia, was constructed in early 1994 as a water supply for the town of Gondar up to the year 2020. The reservoir could not achieve this objective, however, because of significant sedimentation problems. Accordingly, one objective of this study was to simulate the historical reservoir sedimentation pattern, as well as predict the near future (until 2015) sedimentation pattern of Angereb Reservoir. The Sedimentation and River Hydraulics one‐dimensional model (SRH‐1D), version 2.6, was used for this purpose. Another objective was to propose possible mitigation measures to reduce the quantity and rate of sedimentation in the reservoir. There was generally good agreement between measurements and model simulations, with the observed trends being well simulated. The exception was that the model tended to overpredict the sediment deposition volumes in the upstream reaches of the reservoir. The two mitigation alternatives for addressing the sedimentation problem, namely managing sediments in the watershed and flushing sediment through the dam bottom outlet, appear to be technically feasibility, with a predicted reduction of the volume of deposited sediment between 63 and 80% be achievable.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Lakes & Reservoirs: Science, Policy and Management for Sustainable Use
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.