Abstract
A study is made on the applicability and limitation of geostatistical methods in predicting rock mass quality along tunnel alignments based on investigation drillhole data. Two projects were used as the case study: — Lam Ta Khong Pumped Storage Project for a simple geologic setting and Klong Tha Dan Dam Project for a complex geologic setting. The study showed that the estimated rock mass quality and distribution was reasonably comparable with the field observation value for the case of Lam Ta Khong project but it was not the case for Klong Tha Dan Dam site.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.