Abstract

This paper analyses the electrical performance of power supply cables in operation by investigating previous faults and forecasting faults using the Easyfit Professional 5.6 software program. The calculation of the maximum operating time until the first fault occurs is based on an algorithm for estimating the parameters entered in the application, respectively the intervals of good operation time between two successive faults. The case study presented in the paper analyses the probability of failure of a medium voltage power line, under the administration of a distribution operator, based on information collected during maintenance work on medium and low voltage installations in the analysed area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.