Abstract
This study addresses a significant issue related to shield construction, namely the impact of shield construction parameters on ground subsidence. Shield tunnels, owing to their concealed construction, often lead to ground subsidence, causing severe disruptions to ground facilities, potential collapse, and consequent casualties and property loss. Most calculation methods for ground subsidence have a delay, making it difficult to predict ground subsidence in advance based on construction parameters. Therefore, this study collates over 1500 cases of shield construction in China and summarises the impact mechanisms of shield construction on ground subsidence through a detailed study of natural factors, engineering geology, types of structures, and types of construction parameters. Based on the influence law of the data, this study establishes three intelligent prediction methods to forecast ground subsidence. To select the hyperparameters in the models more effectively, a Bayesian optimisation algorithm was utilised. Through a comparative analysis of the models, a subsidence prediction method that is more in line with the construction characteristics and exhibits high accuracy was determined. The findings of this study serve as a valuable resource for predicting ground subsidence resulting from shield construction, enabling timely adjustments to construction parameters and the implementation of preventive measures to mitigate excessive subsidence.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.