Abstract

After more than 20 years of continuous development, part of the wells in the Moxilei-1 gas reservoir located at the Sichuan Basin have entered the middle–later production stage. With the continuous decline in formation pressure and production rates, some of the gas wells have entered the potential period of liquid loading, while some have already suffered water plugging. Currently, the field engineers usually carry out some corresponding drainage measures after the occurrence of liquid loading in the gas well, which will first affect the production progress of the gas field, then increase the difficulty in drainage and reduce the drainage effect afterward. On the basis of Pan’s model for evaluating critical liquid-carrying flow rate, the influence of liquid drop rotation was considered in the new model. Further, combined with the Arps production decline equation, a prediction model of liquid loading timing was deduced. Taking a typical well in the Moxilei-1 gas reservoir as an example, based on the early-stage production data of the gas well, the model was used to predict the liquid loading timing accurately. The model can predict the possibility and timing of liquid loading in gas wells at different production stages. It can check the gas wells with potential liquid loading, so as to reduce the workload for field workers. Furthermore, it can predict the potential liquid accumulation and its timing in advance, so as to guide the field workers to prepare for drainage in advance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call