Abstract

The article is the first part of the series „Prediction construction and assembly production in Lower Silesia.” It was assumed that salary of employees will be one of the independent variables to determine the volume of production. Salaries of employees was predicted, using multiple regression and autoregressive moving average SARIMA methods. An analysis of the results was carried out.
 The errors ME, MAE, MPE, MAPE and Theil coefficients I, I2, I12, I22, I32 were calculated. Multiple regression equation with 12 predictors was set. Predictors were selected from among the 53 independent variables. Forecasted data were obtained for construction and assembly production prediction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.