Abstract
Changes in construction materials prices have a great impact on the cost of construction projects. Such changes in prices occur randomly at different rates over time. There is no clear relationship that can be used to provide accurate calculations of materials prices. One of the biggest problems that faces the construction contracts is unbalanced rights and obligations between owners and contractors (the two parties of construction contracts). It is necessary to have a system that is capable of estimating the size and amount of the change in materials prices at reasonable accuracy. There is also a need to predict the change in building materials prices (either increase or decrease) during the execution phase of the project as well as during the preparation of tenders. Thus, determination of the appropriate lead time to order needed building materials to execute various activities could be done. This research presents a system that utilizes fuzzy logic to identify construction materials that are most sensitive to the change in prices. The research proposes a methodology for identification of construction materials that are most sensitive to the change in prices to be used in modifying the contract price with an attempt to predict the amount of future change in materials prices using neural networks technique. To achieve this objective, the research classifies construction cost items into four different components (building materials, equipment, labor, and administrative expenses), which represent the basic cost elements of any cost item. The system is based on the study of the changes in materials prices that occurred in the Egyptian market from 2000 to 2010. It also provides the impact on the prices of cost items in the priced bill of quantities (BOQ), which is determined by the change in prices of cost items’ materials and their share percent on forming the cost item. Getting to identify materials’ share in the bill of quantities’ items has a great influence on the price of the cost item and the priority in ordering these materials according to their impact on the item’s price. The developed system aids construction contractors in studying bids during the tendering stage and procurement planning during the project’s execution. It can also be used by owners’ representatives to estimate the expected total cost of upcoming projects. The system data are obtained from the Central Agency for Public Mobilization and Statistics in Egypt through published periodicals. A numerical example is presented to demonstrate the use of the proposed system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.