Abstract
We usually met the degradation of superconducting RF cavity on the cryomodule test and beam operation even if the performance of this cavity is good on the vertical test (V.T). Field emission is the most severe problem for this degradation after reassembly work from vertical test. Not only high pressure rinsing (HPR) but also He-processing, which is more suitable method without the reassembly work for recovery, is recommended and tried to recover this degradation. However, we did not investigate the details of how field emission sources were processed and removed after HPR and He-processing. We deeply investigated the processing procedure during He-processing and how many field emission sources removed after HPR by using rotating X-ray mapping system* in V.T .
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.