Abstract

The third Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. Such a structure is new in China and therefore brings new challenges to the work of control surveys. This paper describes the survey methods used for building and erecting the steel pylons and for construction of the steel tower. The survey methods adopted have proven successful and can be used as reference for similar projects in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.