Abstract

Located in Eugene, Oregon, Autzen Stadium at the University of Oregon is one of the premier college football venues in the United States and home of the Oregon Ducks. The continued success of the football program impelled the University to upgrade the stadium facilities to meet the demands of a top-level competitor in NCAA Division I athletics. In less than nine months, over 25,000 lineal ft (7600 m) of seating, 32 new luxury suites, and a private 3000-seat club and lounge level were created. The use of a precast concrete system allowed completion of the stadium expansion and renovation work in record time without interruption to the scheduled athletic program. This article explains how project design challenges and high production levels were achieved within an unremitting construction timetable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.