Abstract
Delays due to bad weather have become common in recent years.When the delay occurs, in most cases, flights will choose ground-holding which results in the waste of airspace resources and reduces the operating efficiency of the entire air route network. In order to deepen the reform of the ATC operations, local rerouting strategy before flight is imperative. In this paper, based on the influence degree and scope of severe weather, historical meteorological data and flight plan data, the damage situation of the air route is comprehensively analyzed, and the segment that pilots need to avoid in route selection is defined. Taking the priority of different city pairs into consideration, the OD pair allocation order model based on AHP (analytic hierarchy process) was established. In addition, this paper establishes the evaluation index of navigation modification combined with the actual operation, and makes a comparative analysis with an example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.