Abstract
The oilfield has entered the ultra-high water cut period, the distribution of remaining oil is scattered, and it is difficult to tap the potential. On the plane, affected by sand body distribution and well pattern production objects, sand body perforation does not correspond to each other, forming residual oil with imperfect injection production relationship; The residual oil formed in the retention area at the edge of the fault due to the influence of fault shielding. Vertically, affected by the heterogeneity, interlayer and rhythm in the layer, the bottom of the thick oil layer is strongly washed, the middle is moderately strongly washed, and the top is weak and not washed. The production difference is large, and the remaining oil mainly exists at the top of the oil layer. The remaining oil with imperfect injection production relationship and special parts is tapped through ultra short radius horizontal wells to improve oilfield development efficiency.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.