Abstract

Shenzhen Metro line no.5 is the longest metro line of Shenzhen in one-time investment which met with complex geological conditions, great technical difficulties and short construction period. According to the characteristics of the project, Shenzhen government broke the traditional mindset to use the BT construction model through ' Investment and Financing-Building Delivery with Design and Construction Return' creatively, and built the structure of project management matching the mode. Exploration and innovation of the management mode focused on the integration of design and construction in the construction process of the metro line No.5 have been done by China Railway Group. Under the BT mode, design management phase should be involved early in the project. Meanwhile, effective work should be done such as technical preparation, design schedule, design modification, quality control, safety control and investment control. The construction practice of the Shenzhen Metro line No.5 indicated that the integration of design and construction is good to condense construction period, ensure the safety and quality of project and investment control.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.