Abstract
ABSTRACT A hydraulic fracture treatment quality control program was implemented in the Oregon Basin Field, Park County, Wyoming to ensure consistently high quality stimulation treatments on polymer augmented waterflood injection wells. The quality of the materials used was checked on location in addition to performing a comprehensive job review prior to each treatment. As a result of the quality control program, significant changes and improvements were made in the quality and performance of the fracture treatments.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have