Abstract
In S Development Area, the production targets of each well net went bad and had interleaved distributions with old well patterns. Meanwhile, polymer flooding well patterns made the conflict of cohesion and dynamic regulation outstanding. Especially, Bei block, first using infill drilling modification, however, had troubles in extra high water period, such as long section of perforation, obvious inconsistencies between formations and high water of layers, which brought difficulties to dynamically adjusting. We selected 1.30 km2 west blocks in Bei block, made tests about sediment group restructuring to improve water flooding development effect, redistributed the series of strata and redistributed the flooding network according to the characteristics of development between the layers, combined comprehensive consideration with follow-up adjustment, such as primary network, injection production system and typed II reservoir the tertiary oil production, optimized the layers combination and well patterns arrangement, finally formed technical ideas of high water cut layers adjustment and well nets evolution.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.