Abstract

In this paper formulae are developed for the rapid estimation of the hydroelectric powerhouse concrete volume for nine different types of surface powerhouses, containing high head vertical or horizontal shaft impulse units; high head Francis units intermediate head Francis, Kaplan, or fixed blade propellor units; low head horizontal shaft tube, rim generator, or bulb units; and low head vertical shaft Kaplan or fixed blade propellor units. Heads range from a minimum of 4.65 m up to a maximum of 825 m. Unit size ranges from a minimum of 3000 kVA to a maximum of 615 000 kVA. The formulae are based on statistics derived from 93 hydro developments. In addition formulae are developed for generator casing diameters as a prerequisite to the development of a chart which indicates whether the turbine or the generator will influence powerhouse concrete volume for intermediate head powerplants. Finally, the formulae are used to compare concrete volumes for horizontal and vertical shaft low head powerplants. Keywords: hydroelectric powerhouse, concrete volume.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.