Abstract

Problems in the creation and exploitation of powerful pulsed electrophysical transformers, developed at the Institute of High-Current Electronics, Siberian Branch of the Russian Academy of Sciences, are discussed. The power of the largest installations is 2.5·1012 W (pulsed). The small size, the outside location of the main components requiring maintenance, and the absence of large volumes of transformer oil make the pulsed transformers competitive with pulsed voltage generators.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.