Abstract

This paper presents the results of a feasibility study for installing FACTS devices in the South-Eastern part of Romanian power grid (Dobrogea a peninsular area), to increase the transfer capacity to the rest of the grid. This study assumed, on one hand, the scheduled increase in generated power in the area, mainly due to two new units in the Cernavoda nuclear power plant (1400 MW installed power) and wind generation with an estimated installed power of over 1600 MW. On the other hand, the scenarios considered the present topology and future developments of the transmission network. The increase in generated power in the S-E part of the power grid may lead to changes in the power market schedules, causing generation decrease or even shut down of other generators, leading to power flow changes and power system stability problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.