Abstract

Modern light rail rapid transit is gaining in popularity and the right power supply equipment is important for the reliable operation of any railway service. This article reviews the design process and equipment supplied to achieve this goal for the Manchester Metrolink. The depth of work and design methods employed to arrive at adequate but cost-effective equipment ratings is presented along with an insight into some of the forward thinking, which has been employed to cater for future requirements.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.