Abstract

To utilize maximum cross section of installed power system conductors, the diversion of imaginary power should be must .With this; we can achieve maximum utilization of real power generated at the station. Generally preset passive inductive VAR generators may share conductor portion when low demand times. Active VAR generators are preferred to overcome this issue .Further control systems helps to determine the required VAR and type of VAR such that conduction period of switch varies according to the requirement of load which is very advantageous nature of active VAR generators. The simulink models of STATCOM and SVC are present in this paper. The results are analyzed accordingly in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.