Abstract

This paper presents a robust and optimal metering systems and optimal Phasor Measurement Unit (PMU) placement for real time power system monitoring taking into account of both normal and contingency cases. Two types of contingencies are named as single branch/meter outage and single branch/PMU outage for optimal meter and PMU placement respectively. The placement of meter and PMU are solved by Biogeography Based Optimization. In the PMU placement study, the virtual bus reduction technique is applied for reducing the scale of the system. Developed placement algorithm is illustrated using IEEE standard systems to demonstrate the effectiveness of the proposed algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.