Abstract

This paper takes Unit Commitment with Wind Power Electric Systems for instance and studies the application of relevant indicators in the short run adequacy decisions. It first conducted running adequacy assessment of the RBTS system, and then given unit combination solutions in the ample index constraints. The results show that the relevant indicators can be more accurately to depict the influence of random factors on system operation adequacy, and Unit Commitment decisions based adequacy index is able to give a unit commitment program at different adequacy levels. The research results provide a set of assessment indicators and assessment methods for short running adequacy problems of random fluctuations power accessing to large-scale power systems..

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.