Abstract

This article presented the results of the development and calculation of the plant supply system for an underwater dock station using a three-phase float wave power plant of the inverted construction. The results of the completed work allow to solve the problem of creating the plant supply system for underwater dock stations and resident underwater robots, as well as speed up their implementation in practice.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.