Abstract

AbstractThe power station facilities at Glockner/Kaprun were constructed in the years from 1946 to 1955. The system consists of a main and an upper stage with a total generation capacity of 353 MW. Since 2006, the association Austrian Hydro Power has been working to extend the existing power station group Glockner/Kaprun with the addition of the pumped storage works Limberg II. This will be a new cavern power station with two reversible pump turbines each of 240 MW installed underground. In the course of 50 years, the technical equipment and tunnelling techniques have developed decisively, enabling the number of employees to be reduced considerably. Construction work high in the mountains was then and is still now characterised by extraordinary difficulties because of the altitude. Regular progress of construction work presumes careful planning and well thought‐out logistics.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.