Abstract

We discuss at the European example how power market design evolves with increasing shares of intermittent renewables. Short-term markets and system operation have to accommodate for the different needs of renewable and conventional generation assets and flexibility options. This can be achieved by pooling resources over larger geographic areas through common auction platforms, realizing the full flexibility of different assets based on multi-part bids while efficiently allocating scarce network resources. For investment and re-investment choices different technology groups like wind and solar versus fossil fuel based generation may warrant a different treatment - reflecting differing levels of publicly accessible information, requirements for grid infrastructure, types of strategic choices relevant for the sector and shares of capital cost in overall generation costs. We discuss opportunities for such a differentiated treatment while maintaining synergies in short-term system operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.