Abstract
Due to the lack of verification with reliable testing methods and testing equipment, the power quality and the safety operation of the energy feedback device in a DC urban rail traction power system should be more deeply investigated. Only satisfactory validation will lead to the application of energy feedback devices, and this leads to a lot of braking energy waste. This paper presents power Hardware-in-the-loop testing method and equipment. With the real-time simulation of both the AC and DC side of the energy feedback device, the energy feedback device will have a comprehensive test in a near real grid environment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.