Abstract

The risk evaluation of empty mine mined-out area is of great significance to the security and stability of the power facilities. But influence evaluation of empty mine mined-out area factor multitudinous, this paper selected seven factors associated with the system. Based on the principle of BP neural network, we build a 3 layer BP neural network model suitable for grid risk evaluation. The BP neural network model was trained by collected samples of empty mine mined-out area and the logical parameters of BP neural network were acquired and tested by the testing samples for accuracy, and finally we proposes preventive measures based on the evaluation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.