Abstract

Despite the widespread usage of high-voltage alternating current (HVAC) for the connection of offshore wind farms (OWF), its use to power-from-shore (PFS) offshore oil and gas (O&G) production sites is often not feasible. Its limitations for long-distance subsea transmission are usually found at 50–70 km from shore and might be even shorter when compared commercially to a direct-current (DC) alternative or conventional generation. Therefore, this research paper aims to address the standardization of offshore transmission with a particular focus on the high-voltage direct current (HVDC) alternative. While the distance is typically not a limiting factor when using DC, and the voltages used are rather standard, the concept of power envelopes can be quite useful in addressing the high variability of offshore site power requirements and setting a design baseline that would lead to improved lead time. In this article, a full back and front-end genetic optioneering model purposely built from the ground up in Python language is used to #1 define up to three DC power envelopes that would cater to most of the candidate’s requirements and #2 provide the lowest cost variance. The results will demonstrate that this can be achieved at a minor overall cost expense.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.