Abstract

In a restructured electricity market environment, the competition in the production and consumption of electric energy leads to the transmission network operating at or beyond one or more transfer limits. Then the system gets congested, resulting in an increase in the cost of electricity and the system security as well as reliability are said to be in danger. The selection of generators to reschedule their output for effective management of congestion is a crucial task for the system operator. This paper presents a differential evolution algorithm based on power flow tracing approach for selection and rescheduling of active power output. The proposed method is demonstrated on IEEE 30 bus and Indian utility 62 bus systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.